This is the old (read-only) version of the site running Mediwiki 1.25

Difference between revisions of "Excalibur's military history"

From Scientolipedia
Jump to: navigation, search
Line 25: Line 25:
 
The Excalibur's keel was [http://en.wikipedia.org/wiki/Keel laid down] on December 8, 1943 by the [http://en.wikipedia.org/wiki/Pullman_Company Pullman-Standard Car Manufacturing Company] of Chicago, Illinois.  Their yard was located on the north side of 130th Street, at [http://en.wikipedia.org/wiki/Lake_Calumet Lake Calumet], which is on the south side of [http://en.wikipedia.org/wiki/Chicago Chicago].  The ship was launched on April 10, 1944.  It entered the [http://en.wikipedia.org/wiki/Calumet_River Calumet River] and headed to the [http://en.wikipedia.org/wiki/Chicago_Sanitary_and_Ship_Canal Chicago Sanitary and Ship Canal].  From there it entered the [http://en.wikipedia.org/wiki/Illinois_River Illinois River] and headed southwest to the [http://en.wikipedia.org/wiki/Mississippi_River Mississippi River], eventually ending up at the [http://en.wikipedia.org/wiki/Naval_Support_Activity_New_Orleans U.S. Naval repair base] in [http://en.wikipedia.org/wiki/New_orleans New Orleans], Louisiana.
 
The Excalibur's keel was [http://en.wikipedia.org/wiki/Keel laid down] on December 8, 1943 by the [http://en.wikipedia.org/wiki/Pullman_Company Pullman-Standard Car Manufacturing Company] of Chicago, Illinois.  Their yard was located on the north side of 130th Street, at [http://en.wikipedia.org/wiki/Lake_Calumet Lake Calumet], which is on the south side of [http://en.wikipedia.org/wiki/Chicago Chicago].  The ship was launched on April 10, 1944.  It entered the [http://en.wikipedia.org/wiki/Calumet_River Calumet River] and headed to the [http://en.wikipedia.org/wiki/Chicago_Sanitary_and_Ship_Canal Chicago Sanitary and Ship Canal].  From there it entered the [http://en.wikipedia.org/wiki/Illinois_River Illinois River] and headed southwest to the [http://en.wikipedia.org/wiki/Mississippi_River Mississippi River], eventually ending up at the [http://en.wikipedia.org/wiki/Naval_Support_Activity_New_Orleans U.S. Naval repair base] in [http://en.wikipedia.org/wiki/New_orleans New Orleans], Louisiana.
 
== Naval duty during World War II ==
 
== Naval duty during World War II ==
On November 1, 1944 the ship was commissioned the PCE(R)-855, commanded by Lt. Arnold C. Anderson.  The PCE(R)-855 had a [http://en.wikipedia.org/wiki/Displacement_(ship) displacement] of 850 tons, a length of 184' 6", a [http://en.wikipedia.org/wiki/Beam_(ship) beam] of 33' 1", a [http://en.wikipedia.org/wiki/Draft_(ship) draft] of 9' 5" and had a top speed of 15.7 [http://en.wikipedia.org/wiki/Knot_(unit) knots].  She had two 2,000[http://en.wikipedia.org/wiki/Bhp bhp] [http://www.tugboatenthusiastsociety.org/Pages/tugmach-diesel-historic-CDED-278A.htm General Motors 12-278A diesel engines] coupled to two [http://www.rexnord.com/Brands/Pages/Falk.aspx Falk single reduction gears] and two [http://en.wikipedia.org/wiki/Drive_shaft propeller shafts].  The ship was [http://www.merriam-webster.com/dictionary/outfit outfitted] with one 3"/50 dual purpose gun, two 40mm anti-aircraft guns, six 20mm guns, two depth charge racks and 3 K-guns (which could fire 300 pound depth charges).  She had a crew of 110 sailors.
+
On November 1, 1944 the ship was commissioned the PCE(R)-855, commanded by Lt. Arnold C. Anderson.  The PCE(R)-855 had a [http://en.wikipedia.org/wiki/Displacement_(ship) displacement] of 850 tons, a length of 184' 6", a [http://en.wikipedia.org/wiki/Beam_(ship) beam] of 33' 1", a [http://en.wikipedia.org/wiki/Draft_(ship) draft] of 9' 5" and had a top speed of 15.7 [http://en.wikipedia.org/wiki/Knot_(unit) knots].  She had two 2,000[http://en.wikipedia.org/wiki/Bhp bhp] [http://www.tugboatenthusiastsociety.org/Pages/tugmach-diesel-historic-CDED-278A.htm General Motors 12-278A diesel engines] coupled to two [http://www.rexnord.com/Brands/Pages/Falk.aspx Falk single reduction gears] and two [http://en.wikipedia.org/wiki/Drive_shaft propeller shafts].  The ship was [http://www.merriam-webster.com/dictionary/outfit outfitted] with one [http://en.wikipedia.org/wiki/3%22/50_caliber_gun 3"/50 caliber dual purpose gun], two 40mm anti-aircraft guns, six 20mm guns, two depth charge racks and 3 K-guns (which could fire 300 pound depth charges).  She had a crew of 110 sailors.
  
 
The PCE(R)'s shakedown was completed in the Gulf of Mexico in January of 1945.  She then sailed through the Panama Canal and arrived at Pearl harbor on February 18, 1945, ready for duty.
 
The PCE(R)'s shakedown was completed in the Gulf of Mexico in January of 1945.  She then sailed through the Panama Canal and arrived at Pearl harbor on February 18, 1945, ready for duty.

Revision as of 23:17, February 15, 2012

PCE(R)-855 USS Rexburg
USS Rexburg, San Francisco Golden Gate, 1958
Length 184' 6"
Beam 33' 1"
Displacement 850 tons
Draft 9' 5"
Top Speed 15.7 knots
Crew 110
Commissioned November 1, 1944

The Scientology Sea OrgAbbreviation for Sea Organization. (Modern Management Technology Defined (C) 1976). ship Excalibur started it's life as a U.S. Naval ship. This is the history of it's life as a Navy "Little Ship".

The birth of the Excalibur

During World War II the U.S. Navy commissioned many different types of ships. One category was the PCE(R), which stood for Patrol Craft Escort (Rescue). The Navy ordered 54 PCE(R)'s, but only 13 ships were built, 12 of which were commissioned. These were armed rescue ships which served three missions; damage control/firefighting, casualty treatment/evacuation and patrol/guard ship. Each ship's hospital had 65 beds, a surgical suite and X-Ray facilities. The medical department had a staff of 11 hospital corpsmen and doctors. These ships were in the category of smaller Navy ships, which were sometimes referred to as "Little Ships".

The Excalibur's keel was laid down on December 8, 1943 by the Pullman-Standard Car Manufacturing Company of Chicago, Illinois. Their yard was located on the north side of 130th Street, at Lake Calumet, which is on the south side of Chicago. The ship was launched on April 10, 1944. It entered the Calumet River and headed to the Chicago Sanitary and Ship Canal. From there it entered the Illinois River and headed southwest to the Mississippi River, eventually ending up at the U.S. Naval repair base in New Orleans, Louisiana.

Naval duty during World War II

On November 1, 1944 the ship was commissioned the PCE(R)-855, commanded by Lt. Arnold C. Anderson. The PCE(R)-855 had a displacement of 850 tons, a length of 184' 6", a beam of 33' 1", a draft of 9' 5" and had a top speed of 15.7 knots. She had two 2,000bhp General Motors 12-278A diesel engines coupled to two Falk single reduction gears and two propeller shafts. The ship was outfitted with one 3"/50 caliber dual purpose gun, two 40mm anti-aircraft guns, six 20mm guns, two depth charge1. harmful energy or force accumulated and stored within the reactive mind, resulting from the conflicts and unpleasant experiences that a person has had. Auditing discharges this charge so that it is no longer there to affect the individual. (Scn AD)..more racks and 3 K-guns (which could fire 300 pound depth charges). She had a crew of 110 sailors.

The PCE(R)'s shakedown was completed in the Gulf of Mexico in January of 1945. She then sailed through the Panama Canal and arrived at Pearl harbor on February 18, 1945, ready for duty.

File Usage

This page links to the following files;